Capabilities

Engineered concrete and demolition, inside plants that keep running.

We hold a general contractor’s license, which means one call covers the concrete, the demolition, the steel, the drainage and whatever else the problem turns out to actually be.

Heavy industrial foundations

Machine foundations, silo foundations, furnace pits.

Ready-mix plant foundations, sand screw foundations, conveyor supports, tram pads, containment areas, bin walls. 250-yard pours with 10-foot walls and waterproof concrete. We have poured under a suspended furnace and beside a running corrugator.

Two completed six-foot-thick ready-mix plant foundations at an aggregate facility
A large curved reinforcing cage standing against the sky before placement
Completed cast-in-place bin walls at an aggregate plant
Heavy reinforcing mat tied for a plant foundation, batch plant behind

Demolition & replacement

Taking it out is the hard part. That is the part we are best at.

Selective demolition inside operating plants — saw cutting, breakout, haul-off, and the new pour behind it. Our saw runs 75 horsepower and cuts 20 inches deep with a 42-inch blade. We bring two.

Excavator-mounted hammer breaking out floor beside installed trench steel inside a high-bay plant
The finished trench and cover system flush with the plant floor
Hydraulic hammer breaking out reinforced plant floor slab
Crew saw cutting a foundation directly beneath a suspended furnace

Shutdown & outage work

The window is fixed. We plan the whole job around it.

Most of this work is scheduled months out — a plant hands us an outage window and we hand the line back inside it. When the window moves, we move with it. An engineer once had us in his schedule wrong and needed an eighteen-hour job sooner; we were on site in two hours and finished in eight.

Concrete pump running at night alongside a lit plant during a scheduled shutdown
Plant floor cleared and laid out under an overhead crane, ready for demolition to start
Two hydraulic breakers working the furnace foundation at once rather than one working twice as long
Formwork and reinforcing set beneath a corrugator pre-feeder before the pour

Design-build & general contracting

One number to call, whatever the problem turns out to be.

When you are not sure which way to go, you get alternatives and what each one costs, not one price and a shrug. We hold a general contractor's license, so when the concrete problem turns out to be a drainage problem or a steel problem or a door problem, it does not become your problem. Enclosures, gates, docks, material handling, structural steel.

Industrial rolling entrance gate installed and operating
Custom commercial equipment enclosure
Loading dock demolished back to subgrade during a scheduled shutdown
Dock leveler pits formed and reinforced
They were onsite the very next morning to assess the work, begin demolition, and prepare the affected areas.
Andre Presley — Maintenance Manager · More
Two concrete pump booms working the same placement — a spare on site, not on call
Laser screed placing and levelling a large industrial floor pour
Concrete pump set up indoors for a 160 yard placement
Large excavator working an industrial site excavation
Excavator cutting into compacted ground on a plant expansion
Record crew working a plant floor placement